AS9100 audit checklist: FAI and inspection records.

Generic AS9100 checklists walk every clause and tell you nothing about the one drawer an auditor will open in quality. This is what they actually pull when they sample your first article and inspection records, what they write up, and how to check yourself before they arrive.

The short answer
  • An AS9100 auditor checking FAI and inspection records picks one or two shipped jobs and traces each one end to end: purchase order, drawing revision, first article inspection (FAI) report, gauges and their calibration, material and special-process certs, nonconformance reports (NCRs) and release.
  • FAI sits in AS9100D clause 8.5.1.3, production process verification. Most inspection-area findings come from the clauses around it: 7.1.5 (measuring equipment and calibration), 7.5 (documented information), 8.4 (purchased material and supplier test reports), 8.5.2 (traceability), 8.6 (release) and 8.7 (nonconforming outputs).
  • The findings written most often in this area are records that don't connect: an out-of-calibration gauge on an inspection record, no new FAI after a change, certs filed but not checked, and a reject with no NCR.
  • To check yourself, pull three of your own FAIs and run the 30-minute self-audit on this page. If a record breaks the trace, an auditor will find the break too.

How does an AS9100 auditor sample inspection records?

An AS9100 auditor samples inspection records by picking a recent job and following it from purchase order to shipment, asking for each record along the way. That method is called a process audit. A certification body auditor has limited hours in your building and won't read every FAI. They'll ask for a list of recent jobs and pick one or two, often a newer part, a recent revision change, or a job with special processes. The trace is where the gaps show.

A typical trace goes like this:

  1. Show me the purchase order. What quality clauses did it carry? Did it require an AS9102 FAI?
  2. Which drawing revision did you make it to? Show me that it matches the PO.
  3. Show me the FAI. Is it full or partial? If partial, where's the baseline?
  4. Pick a balloon. Which gauge measured it? Show me that gauge's calibration record on that date.
  5. Show me the material and special-process certs listed on Form 2. Did anyone check the values against the spec?
  6. This characteristic is out of tolerance. Where's the NCR?
  7. Who released the shipment? On what evidence?

Each question maps to an AS9100D clause, listed in the checklist below.

What is on an AS9100 audit checklist for FAI and inspection records?

An AS9100 audit checklist for FAI and inspection records covers eleven AS9100D clauses, from 7.1.5 (measuring equipment) to 8.7 (nonconforming outputs). Clause numbers and titles below are from AS9100D. The descriptions are paraphrases, not the standard's text.

ClauseWhat they ask forTypical findingHow to be ready
7.1.5 Monitoring and measuring resources (incl. 7.1.5.2 measurement traceability)The register of measuring equipment and the calibration recall process. Cal records for gauges named on a sampled FAI. What you did when a gauge was found out of tolerance.Gauge on Form 3 was past due on the inspection date, or isn't in the register. No assessment of earlier results after an out-of-tolerance cal.Record a gauge ID on every reading. Check cal dates before signing. Keep a written impact assessment for every failed cal.
7.2 CompetenceTraining or qualification for the inspector and the CMM programmer. Who is authorized to approve an FAI.FAI signed by someone with no documented authority or training on file.Keep a short authorization list: who can prepare, who can review and approve, who can run the CMM.
7.5 Documented information (esp. 7.5.3 control of documented information)Retrieve a specific FAI, fast. Show it is protected from unintended changes. Show your retention rule.Baseline FAI for a partial can't be found. Signed report edited with no revision record. Forms on a shared drive anyone can overwrite.One place for FAIs, indexed by part number and revision. Lock or revision-control signed records.
8.2.3 Review of the requirements for products and servicesProof you reviewed the PO quality clauses before accepting the order.PO required the customer's own FAI form or a source inspection; nobody caught it.Contract review checklist with a line for "FAI required? whose form? any customer approval?"
8.4 Control of externally provided processes, products and services (incl. 8.4.2 type and extent of control)Material and special-process certs for the sampled job. Evidence the test report data was evaluated, not just filed (8.4.2 asks for a process to do this when you rely on supplier test reports). Approval status of the processor.Receiving matched the cert to the PO but never checked chemistry or mechanicals against the spec. Processor not on the customer's approved list.Receiving checks values against spec limits and initials the cert. Check customer-required processor approvals before you issue the PO.
8.5.1.1 Control of equipment, tools and software programsHow NC programs and CMM programs are controlled and proven before use.Program changed on the machine with no record and no FAI consideration.Revision-control NC and CMM programs. Tie program changes to your FAI trigger review.
8.5.1.2 Validation and control of special processesRecords that special processes were done by qualified people and approved sources.Cert from a heat treater or plater that doesn't name the spec or the revision.Reject certs that don't name spec and revision. Fix it at receiving, not at FAI.
8.5.1.3 Production process verificationThe FAI for a new part, done on a representative part from the first production run. A new full or partial FAI after a change that invalidates the original result.No FAI after a revision change. FAI done on a prototype, not a production-run part. Failed items accepted on the FAI without closure.A written list of FAI triggers, checked at every new order and every change. See full vs partial FAI.
8.5.2 Identification and traceabilityTrace the FAI part back to its material heat or lot, and forward to the shipment.FAI piece has no serial or lot ID. The material cert referenced on Form 2 is for a different heat than the one on the traveler.Record the FAI piece's serial or lot number on Forms 1 and 2. Make sure the cert number on Form 2 covers the heat on the traveler.
8.5.6 Control of changesHow a process change (machine, fixture, supplier) was reviewed.Job moved machines; no review, no partial FAI.Route every process change through the same FAI trigger check.
8.6 Release of products and servicesEvidence of conformity and who authorized release, for the sampled shipment.Lot shipped before the FAI was complete, with no documented authorization. Inspection record unsigned or undated.Final inspection record with name, date and acceptance. Ship-hold until FAI is signed, unless authorized in writing.
8.7 Control of nonconforming outputsThe NCR for any out-of-tolerance reading on a sampled FAI or inspection record.Form 3 shows a reject; no NCR, no disposition, no customer approval for use-as-is.Every reject on Form 3 references an NCR number. Use-as-is and repair dispositions need approval from the design authority (often the customer) where required.

AS9100D doesn't mandate AS9102 forms. Clause 8.5.1.3 requires production process verification, and the standard notes that this activity is often referred to as first article inspection. AS9102 is referenced in the standard's annexes as guidance. The AS9102 format usually becomes mandatory through your customer's PO or supplier quality requirements. Either way, the auditor checks you met what the customer asked for.

What are the ISO 13485 equivalents for medical shops?

ISO 13485:2016 covers the same records under different clause numbers: 7.6 for measuring equipment, 4.2.4 and 4.2.5 for documents and records, 7.4.3 for verifying purchased product, 7.5.8 and 7.5.9 for identification and traceability, 8.2.6 for product monitoring and release, and 8.3 for nonconforming product. The mapping isn't one-to-one, so treat the table as a pointer, not a crosswalk.

AS9100DISO 13485:2016, closest clause
7.1.5 Monitoring and measuring resources7.6 Control of monitoring and measuring equipment
7.5 Documented information4.2.4 Control of documents, 4.2.5 Control of records
8.4 External providers7.4 Purchasing (7.4.3 Verification of purchased product)
8.5.1.2 Special processes7.5.6 Validation of processes for production and service provision
8.5.1.3 Production process verificationNo direct equivalent. Covered in part by process validation (7.5.6), product monitoring (8.2.6) and customer requirements.
8.5.2 Identification and traceability7.5.8 Identification, 7.5.9 Traceability
8.6 Release8.2.6 Monitoring and measurement of product
8.7 Nonconforming outputs8.3 Control of nonconforming product

What are the most common AS9100 audit findings in inspection?

The most common AS9100 audit findings in inspection are broken links between records, not measurement errors. These are the ones job shop quality managers hear about again and again. The order below is not a ranking.

  1. Overdue gauge on a record. A caliper or pin gauge that was a week past its cal due date when it measured a characteristic. Easy to write, hard to argue with.
  2. No look-back after a failed calibration. The cal lab reported a micrometer out of tolerance. Nobody checked which jobs it measured since its last good cal. AS9100D 7.1.5.2 expects you to assess whether earlier results are still valid.
  3. Missing FAI after a change. Rev C to Rev D, or a job moved to a new machine, and the FAI file still only has the old report.
  4. Certs filed, not checked. The mill cert is in the folder. Nobody compared the tensile or chemistry values to the spec. See CoC vs material cert for what to check on receipt.
  5. Reject with no NCR. Form 3 shows a characteristic out of tolerance with "OK per engineering" written next to it and nothing else.
  6. Can't find the record. The FAI exists somewhere, maybe on the old quality manager's laptop. Fifteen minutes of searching in front of the auditor can become a finding of its own.
  7. Signed record changed. A Form 3 value corrected after signature with no record of who changed it and why.

Few of these findings are about measurement skill. Almost all are about records connecting to each other, which is why the auditor's trace matters.

Every trace starts with a ballooned drawing that matches the PO revision.

Try the free ballooner

What questions does an AS9100 auditor ask in quality?

An AS9100 auditor in the quality area asks you to show records, not describe procedures: why an FAI was or wasn't needed, which gauge took a reading, what happened to a reject. Practice answering these out loud, with the record in hand.

  • "Walk me through how you decide an FAI is needed for this order."
  • "This is a partial FAI. What's it partial against, and why are these characteristics in scope?"
  • "Which gauge took this reading? When was it last calibrated? What's its due date?"
  • "This gauge failed calibration in March. Show me what you did about the parts it measured."
  • "How do you know this heat lot met the material spec?"
  • "Who's allowed to sign as reviewer on an FAI? Where's that written down?"
  • "If I change a number on this report, how would anyone know?"
  • "Show me the NCR for balloon 37."

How do you self-audit your FAI records before an AS9100 audit?

Self-audit FAI records by pulling three FAIs and tracing each one the way an auditor would, against the nine checks below, in about ten minutes each. Pick one full FAI for a new part, one partial FAI after a revision change, and one from a job with a special process. Set a timer.

CheckPass if
PO vs drawing revision vs Form 1All three show the same part number and revision.
FAI requirementThe PO's FAI clause (form, customer approval, source inspection) was met.
Partial FAI baselineThe baseline full FAI is in the file and was accepted.
Three random balloonsEach has a result, a gauge ID, and that gauge was in cal on the inspection date.
RejectsEvery out-of-tolerance result points to an NCR with a disposition.
Form 2 certsEach cert names the spec and revision, values were checked against the spec, and the heat or lot matches the traveler.
TraceabilityFAI piece serial or lot is recorded and ties to the shipment.
SignaturesForm 1 is signed and dated by the preparer and by a different person as reviewer, who is on your authorization list.
Record controlYou found all of it in under ten minutes, and nothing was edited after signature without a record.

Anything that fails goes on your internal audit or corrective action list now, not the day before the audit. For a fuller pre-submission list for new FAIs, use the first article inspection checklist. For the forms themselves, see Form 1 explained, Form 2 explained and the Form 3 guide.

IAQG is revising AS9100D into a new standard named IA9100. When your registrar moves you to it, clause numbers may shift. The auditor's questions won't.

Where does FAI software help with an audit?

FAI software helps by keeping the links between records intact, which is where most of the findings above come from. In Toolrick, each reading carries its gauge, a reading taken with an out-of-calibration gauge blocks sign-off, the preparer and reviewer each re-authenticate to sign, and every edit lands in an audit trail. Partial FAIs come from a revision compare against the baseline. You still decide what's in scope, and people, not the software, sign. The free ballooner is the place to start.

Related: Full vs partial FAI · AS9102 Rev C changes · Why FAI reports get rejected · Free AS9102 templates · Calibration out of tolerance: what to do · Non-conformance report example

FAQ

Which AS9100 clause covers first article inspection?

AS9100D clause 8.5.1.3, production process verification, covers first article inspection. It requires you to verify that the production process can make parts that meet requirements, using a representative item from the first production run of a new part or assembly, and to repeat that when changes invalidate the original result. The standard notes that this activity is often referred to as first article inspection (FAI).

Does AS9100 require AS9102 forms?

No. AS9100D requires production process verification under clause 8.5.1.3, not a specific form, and refers to AS9102 as guidance. AS9102 forms become a requirement when your customer's purchase order or supplier quality requirements call for them, which many aerospace customers do. An auditor checks that you verified the production process and that you did what the customer required.

What are the most common AS9100 audit findings in inspection?

Common AS9100 findings in the inspection area are: a gauge on an inspection record that was overdue for calibration or not in the register; no assessment of earlier results after a gauge failed calibration; no new or partial FAI after a drawing or process change; material certs filed but not checked against the spec; a failed characteristic accepted without an NCR; and FAI records that cannot be found or were changed after signature.

How long do I need to keep FAI records?

AS9100D does not set a retention period for FAI records; it requires you to define and control retention, and your customer's purchase order or quality clauses usually set the period. ISO 13485:2016 clause 4.2.5 requires records to be kept for at least the device lifetime defined by the organization, and not less than two years from release. Keep a baseline full FAI for as long as any partial FAI depends on it.

Sources

  1. How does First Article Inspection fit into AS9100 Rev D?, Advisera 9100 Academy
  2. FAI requirement in AS9100 Rev D, Advisera Expert Advice Community
  3. AS9100 8.4.2 Type and extent of control: external provider test reports, Elsmar Cove forum
  4. Why is OOT important in measurement traceability?, Utah MEP
  5. 21 CFR 820.10, requirements for a quality management system (cites ISO 13485 7.5.8 and 7.5.9), Legal Information Institute, Cornell Law School
  6. Guidelines for getting a record retention policy (ISO 13485 4.2.5), Advisera Expert Advice Community
  7. Aerospace standard revision (AS9100 to IA9100), Amtivo

FAI records that hold up to a trace.

Balloon a drawing for free, then try gauges, sign-off and the audit trail for 14 days.