FAI report rejected? Here's what the SQE saw.

The parts are good, the CMM report is clean, and the FAIR still comes back. Most rejections are the same dozen paperwork problems. Here's each one from the reviewer's side of the desk, how to stop it, and a checklist to run before you hit send.

The short answer
  • Most AS9102 first article inspection reports (FAIRs) are rejected for paperwork, not parts: a wrong drawing revision, balloons that don't match Form 3, unballooned notes, "OK" instead of measured values, and Form 2 certs that don't trace to a customer-approved source.
  • A customer SQE checks consistency first. Part number, revision, serial number and FAIR identifier must match across Forms 1, 2 and 3, the ballooned drawing and the purchase order.
  • Out-of-tolerance results need the actual value, an NCR or deviation number on Form 3, and "Yes" on AS9102 Rev C Form 1 field 19 (documented nonconformances).
  • Run the 12-line pre-submission checklist below on every FAIR before it leaves the building.

How does a customer SQE review a FAIR?

A supplier quality engineer (SQE) checks that the package hangs together before checking any measurement. If the forms, drawing and PO don't agree, the FAIR often comes back before anyone looks at your data.

An SQE with forty FAIRs in the queue doesn't start with your numbers. A typical review pass looks like this:

  1. Match Form 1 to the PO: part number, revision, PO number, supplier code.
  2. Count the balloons on the drawing. Count the rows on Form 3. Compare.
  3. Scan the Form 3 results column for anything that isn't a number.
  4. Look for any result outside its tolerance, and for an NCR number next to it.
  5. Read Form 2 against the drawing notes and the customer's approved-source list.
  6. Check the Form 1 signatures and dates.

Only then does the SQE spot-check measurements, usually the key characteristics and the tight tolerances. That's why most of the reasons below are about records, not parts.

Why do FAI reports get rejected? 12 common reasons

FAI reports get rejected when the record can't prove that every requirement was met by the right part to the right revision. The twelve reasons below are the ones customer FAIR guidelines and SQEs raise most, each with what the reviewer sees and how to prevent it.

1. Wrong or missing drawing revision

What the SQE sees: The PO calls for drawing Rev F. Form 1 says Rev E, or the attached ballooned drawing is Rev E, or the revision field is blank. Sometimes the PO also references an ECN or deviation that's nowhere in the package.

Prevent it: Pull the revision from the PO, not from the folder. Record the drawing number and drawing revision on Form 1, the part revision too if it differs, and list any additional design changes the PO references (ECNs, engineering orders, deviations) in the additional changes field. Check the revision on the drawing you actually ballooned.

2. Balloon count doesn't match Form 3

What the SQE sees: The drawing goes to balloon 84. Form 3 ends at 81, or skips 40, or has 37 twice. Each gap is a characteristic with no evidence.

Prevent it: Reconcile before you sign: the last balloon number on the drawing equals the number of Form 3 lines, with no skips and no duplicates. If a balloon is intentionally removed, keep the row and say why. See AS9102 Form 3 explained for how each column should read.

3. Notes and flag notes not ballooned

What the SQE sees: Every dimension is ballooned, but general notes like "Break sharp edges 0.25 max", "Anodize per MIL-A-8625 Type II Class 1" or a flag note tied to three features have no balloons. Reviewers know where the notes are, and they look.

Prevent it: Account for every drawing note on Form 3, and every instance of a flag note. Notes that don't apply to the part can be grouped on one line with the reason, if the customer accepts that. Material and process notes also drive Form 2 lines. The ballooning guide covers notes, title block tolerances and multiplied features.

4. "OK" or "Pass" instead of actual values

What the SQE sees: A bore at Ø12.000 +0.018/-0 with a result of "OK". A true position with a tick. The SQE can't tell if the bore measured 12.017 or 12.002, so there's no evidence, just an opinion.

Prevent it: If a characteristic can be measured, record the number: 12.011. For a multiplied feature, record every instance. Attribute results ("Conforms") are for visual checks, notes and go/no-go gauges, and even then name the gauge. For position, record the actual positional value, not the raw CMM coordinates; some primes' FAIR guidelines say CMM data alone isn't acceptable for a positional tolerance. Our guide to reading a CMM report shows which column to pull, and the true position calculator helps check hand calculations.

5. No gauge or method traceability

What the SQE sees: Results with no indication of how they were measured, or a gauge ID that, when asked, turns out to have been past its cal due date on the inspection date.

Prevent it: Put the gauge ID or CMM program reference against each result, in the designed/qualified tooling column, the comments column or the customer's designated field. Check every gauge's cal due date against the inspection date before signing, not after. When a gauge is found out of calibration, AS9100 clause 7.1.5.2 requires you to assess whether earlier results are still valid, so every reading from that gauge on the FAIR is open to question.

6. Units and conversions don't match

What the SQE sees: An inch drawing with millimetre results from a metric CMM program. Or a mixed-unit drawing where some rows were converted and some weren't. A result of 0.500 next to a 12.70 requirement makes a good part look like scrap.

Prevent it: Report in the drawing's units, at the precision of the tolerance. If the drawing has dual dimensions, follow the primary unit. Set the CMM program's units to match the drawing so nobody converts by hand.

7. Form 2 certs missing, or not from an approved source

What the SQE sees: The drawing calls out heat treat, passivation and a fluorescent penetrant inspection. Form 2 lists the material only. Or the plater on Form 2 isn't on the customer's approved special process source list, or the cert number on Form 2 doesn't match the cert attached.

Prevent it: Build Form 2 from the drawing notes and the PO, one line per material, special process and functional test, each with its specification, the supplier, the customer-designated code where the customer uses one, and the certificate of conformance number. Check each special process supplier against the customer's approved list and answer the customer approval verification column (Yes, No or N/A) honestly. See AS9102 Form 2 explained and C of C vs material cert.

8. A nonconformance with no NCR or deviation reference

What the SQE sees: A result outside tolerance and an empty nonconformance column. Or, worse, a result that's been nudged to sit just inside the limit.

Prevent it: Record the actual value, write the NCR or deviation number in the Form 3 nonconformance column, and answer Rev C Form 1 field 19, "Does the FAIR contain documented nonconformance(s)?", with "Yes". A nonconformance accepted use-as-is or on a customer deviation is still documented, so the answer stays "Yes"; some primes' AS9102C supplier guides say this explicitly. Expect a partial FAI on that characteristic once the cause is fixed.

9. Partial FAI with no baseline or reason

What the SQE sees: A FAIR marked partial that re-checks six characteristics after a revision change, with no baseline part number and revision, no reason, or a baseline that the customer never accepted.

Prevent it: In Form 1 field 14, give the baseline part number including revision and a specific reason ("Rev C to D, ECN 4471, hole 7 tolerance"). Rev C requires a reason for every FAI, full or partial. Include every characteristic the change could affect, not only the one that changed on paper. The full vs partial FAI guide has worked examples.

10. Signatures missing, or the same person twice

What the SQE sees: An unsigned Form 1, a typed name with no signature or unique mark, dates that come before the inspection, or one person in both signature fields when the customer requires two.

Prevent it: In Rev C the signatures are on Form 1 only: field 20 (FAIR verified by) and field 22 (FAIR reviewed/approved by), each with a date. Sign and date after the last result is entered. AS9102 Rev C says the field 22 person should not be the field 20 person, but that is a recommendation: training material such as Paradygm's notes the provision lets a small shop with one qualified person sign both. Many customers require two different people. If your shop is that small, ask the customer what they'll accept before the first submission.

11. The customer's own form or requirements ignored

What the SQE sees: A generic AS9102 package when their supplier quality manual requires their own form, a specific file format, an upload to their portal, extra fields such as key characteristic codes, or a CMM report attached for every characteristic.

Prevent it: Read the PO clauses and the customer's supplier quality manual when the order lands, not when the FAIR is ready. Keep a one-page cheat sheet per customer. If they use a portal, know its field rules: see our guide to Net-Inspect FAI uploads.

12. Wrong part number, serial number or FAIR identifier

What the SQE sees: Form 3's header shows a different serial number than Form 1. The part number on the report has a dash number that doesn't match the PO. The FAIR identifier differs between forms because someone copied last job's template.

Prevent it: Fill the header once (part number, part name, serial number, FAIR identifier) and carry it across all three forms. Mark the FAI part physically, and record that serial number on every form. Never start a FAIR by saving over an old one.

Reasons 2, 3 and 4 start at the ballooning step. Try the free ballooner and check its count against your drawing.

Try the free ballooner

What should you check before submitting a FAIR?

Check revision, balloon count, actual values, gauge calibration, Form 2 sources, nonconformances, signatures and header consistency. Print this list and run it on every report before it leaves the building. Each line maps to a reason above.

✓CheckReason
☐Drawing number and revision on Form 1 match the PO and the ballooned drawing attached. Any ECN or deviation on the PO is listed.1
☐Last balloon number equals Form 3 line count. No skips, no duplicates. Removed balloons explained.2
☐Every note, flag note and title block requirement that applies is ballooned and on Form 3.3
☐Every measurable characteristic has an actual value. Every instance of a multiplied feature has a result.4
☐Gauge ID or CMM program recorded for each result. Every gauge was in calibration on the inspection date.5
☐Results in the drawing's units, at the tolerance's precision.6
☐Form 2 has a line for every material, special process and functional test on the drawing and PO, with spec, supplier, code and cert number. Special process suppliers are on the customer's approved list.7
☐Every out-of-tolerance result shows the actual value and an NCR or deviation number. Form 1 field 19 is answered "Yes" if there is one.8
☐Form 1 field 14 gives the reason. If partial: baseline part number and revision, and full scope of affected characteristics.9
☐Form 1 fields 20 and 22 signed and dated after the last result, by different people if the customer requires it.10
☐Customer's form, portal and extra requirements followed.11
☐Part number, serial number and FAIR identifier identical on all three forms and the part.12

For the full list of what goes into a package before you start inspecting, see the first article inspection checklist. For the audit side of the same records, see what AS9100 auditors check in FAI records.

Frequently asked questions

What is the most common reason an FAI report is rejected?

Paperwork, not parts. The usual causes are a drawing characteristic or note with no matching Form 3 row, a drawing revision that doesn't match the purchase order, results written as "OK" instead of measured values, and Form 2 certifications that are missing or don't trace to the customer's approved special process sources. A customer SQE checks these before looking at any measurement.

Can an FAI pass with a nonconforming characteristic?

The FAIR can be submitted, but it must record the actual value on Form 3, reference the NCR or approved deviation, and answer "Yes" to AS9102 Rev C Form 1 field 19, which asks whether the FAIR contains documented nonconformances. Once the cause is corrected, a partial FAI re-verifies the failed characteristics. Customers may hold parts until that partial FAI is accepted.

What happens after a FAIR is rejected?

The customer returns the FAIR with reasons, and parts are often held until a corrected FAIR is accepted. Fix the record, re-measure where the evidence is missing, and resubmit the complete package, not only the corrected page. If the rejection points to a process problem rather than a paperwork error, expect an NCR or a corrective action request as well.

Do I need to record a measured value for every characteristic?

For any variable characteristic you can measure, yes: record the actual value, not "OK" or a tick. For a positional tolerance, record the actual positional value, not raw CMM coordinates. Attribute characteristics such as visual checks, notes or go/no-go gauges can be recorded as conforming, with the method or gauge identified. Check your customer's requirements, since some ask for more.

Can the same person sign AS9102 Form 1 fields 20 and 22?

AS9102 Rev C says the person approving in field 22 should not be the person who verified the FAIR in field 20. Training material such as Paradygm's reads this as a recommendation that lets a small shop with one qualified person sign both. Many customers require two different people, so check the purchase order and the customer's quality clauses before one person signs both.

Where software helps

Several of these are mechanical checks that software does more reliably than a tired inspector at 4pm. In Toolrick, every balloon is a Form 3 row by construction, so counts can't drift apart. Results are entered as values, or pasted from CMM text output. A reading taken with an out-of-calibration gauge blocks sign-off. The Form 1 nonconformance question is answered from the recorded results, and a preparer and an approver sign separately. Balloons it's unsure about are flagged with a reason for a human to check. It won't read your customer's quality manual for you.

Related: AS9102 Form 3 explained · AS9102 Form 1 explained · PPAP vs FAI · Free AS9102 templates · Non-conformance report example · First article inspection report template

Sources

  1. AS9102 First Article Inspection Report (FAIR) Common Mistakes, GKN Aerospace.
  2. AS9102 First Article Inspection Report Rev B vs Rev C, Net-Inspect.
  3. AS9102C Form 1 details, Paradygm.
  4. AS9102C Form 2 details, Paradygm.
  5. FAI_STD-001 First Article Inspection standard, Sonaca (customer FAIR requirements and AS9102 triggers).

Send FAIRs that come back approved.

Balloon a drawing free, then build and sign the AS9102 report in a 14-day trial.