- FAI proves the part. An AS9102 first article inspection (FAI) verifies one representative part from the first production run against every drawing and specification requirement, recorded on AS9102 Forms 1, 2 and 3.
- PPAP proves the process. The AIAG Production Part Approval Process (PPAP) manual lists 18 elements, including dimensional results, PFMEA, control plan, MSA and initial process studies, run on parts from a significant production run. Submission Level 3 is the default unless the customer specifies another level.
- They overlap on the layout and the certs. PPAP element 9 (dimensional results) covers the same ground as AS9102 Form 3, and element 10 (material and performance test results) overlaps Form 2. The ballooned drawing, characteristic list, gauge records and certs carry over. The forms, sample sizes and approval rules don't.
- Aerospace PPAP includes the FAI. AS9145, the aerospace APQP and PPAP standard, has 11 PPAP elements, and the first article inspection report is one of them.
What is the difference between PPAP and FAI?
FAI verifies that one part meets every design requirement. PPAP shows that a production process can make conforming parts consistently at the quoted rate. They come from different industries and answer different questions.
FAI (first article inspection), as aerospace shops know it, is defined by AS9102, a standard developed by the International Aerospace Quality Group (IAQG) and published by SAE (EN 9102 in Europe). An FAI is a complete, documented verification of a representative part from the first production run: every balloon on the drawing, every material and special process, every functional test. The output is a first article inspection report (FAIR) on three forms. A correct FAIR tells the customer that this part was made to print by this process.
PPAP (Production Part Approval Process) comes from automotive and is defined in the AIAG PPAP manual. PPAP still includes a full dimensional layout, but that layout is one element out of eighteen. The other elements are about the process: how it flows (process flow diagram), what can go wrong (PFMEA), how you'll control it (control plan), whether your gauges can be trusted (MSA, measurement system analysis), and whether the process is capable over a real production run (initial process studies). An approved PPAP tells the customer you can make the part repeatedly, at volume.
People sometimes call an FAI a subset of PPAP. That's close to true for the measurements, but the paperwork isn't interchangeable, as the table below shows.
How do PPAP and FAI compare side by side?
PPAP and FAI share a full dimensional layout and the material and process certs. They differ in sample size, statistics, risk analysis, approval and the events that trigger a redo.
| AS9102 FAI | AIAG PPAP | |
|---|---|---|
| Origin | Aerospace. AS9102 (also EN 9102). AS9100D clause 8.5.1.3, production process verification, requires the activity. AS9102 is the usual method, normally called up by the customer's PO or quality clauses. | Automotive. AIAG PPAP manual, required through IATF 16949 and each OEM's customer-specific requirements. |
| Question it answers | Does this part meet every design requirement? | Can this process make conforming parts consistently at the quoted rate? |
| Sample | A representative part from the first production run. Assembly FAIs reference the FAIs of their detail parts. | Parts from a significant production run: one to eight hours of production and at least 300 consecutive parts, unless the customer specifies otherwise. |
| What's submitted | Form 1 (part number accountability), Form 2 (product accountability: materials, special processes, functional tests), Form 3 (characteristic accountability), plus the ballooned drawing and supporting evidence. | A Part Submission Warrant (PSW) plus whichever of the 18 elements the submission level calls for. |
| How much is sent | The whole FAIR, every time. Scope is set by full vs partial FAI, not by a level. | Set by submission level 1 to 5. Level 3 is the default unless the customer specifies otherwise. |
| Ballooned drawing | Yes. Every balloon has a row on Form 3. | Yes. The dimensional results are tied to a marked (ballooned) design record. |
| Dimensional results | Actual values for every characteristic on the FAI part. | Actual values for every characteristic, from each unique production process: each cavity of a multi-cavity tool, each die, each duplicate line or cell. |
| Statistics | None required by AS9102. Key characteristics may carry separate variation-management requirements from the customer. | Initial process studies on special characteristics. For a stable process: index above 1.67 meets the acceptance criteria; 1.33 to 1.67 may be acceptable after review with the customer; below 1.33 does not meet the criteria. |
| Risk analysis | Not part of the FAIR. | Design FMEA (if the supplier is design-responsible) and process FMEA. |
| Customer sign-off | Customer approval fields on Form 1 (fields 24 and 25 in Rev C), if the customer requires them. Many customers review without signing. | Customer disposition on the PSW: approved, interim approval or rejected. |
| Redone when | Design change affecting fit, form or function; change of manufacturing source, process, inspection method, location, tooling or material; NC program change; a natural or man-made event that could affect the process; or a two-year lapse in production. Each applies where the change could affect the part, and a partial FAI can cover it. | New part, correction of a discrepancy, engineering change, and the customer-notification events: different construction or material, new or modified tooling, refurbished or rearranged tooling, a move to a different plant, a change of subcontractor for parts, materials or services such as heat treat or plating, a change of test or inspection method, or tooling inactive for volume production for 12 months or more. |
PPAP rules come from the AIAG manual and are then modified by each customer's specific requirements. AS9102 is likewise modified by purchase order flow-downs. When your customer's manual disagrees with either standard, the customer's manual wins.
Do PPAP levels 1 to 5 match AS9102 Forms 1 to 3?
No. PPAP levels control how much you send to the customer. AS9102 forms are parts of one report, and every FAIR uses all three.
| PPAP level | What goes to the customer |
|---|---|
| Level 1 | Part Submission Warrant only (plus an appearance approval report for designated appearance items). |
| Level 2 | PSW with product samples and limited supporting data. |
| Level 3 | PSW with product samples and complete supporting data. The default when the customer doesn't specify a level. |
| Level 4 | PSW and other requirements as defined by the customer. |
| Level 5 | PSW with product samples and complete supporting data reviewed at the supplier's manufacturing site. |
Whatever the PPAP level, the supplier keeps every applicable element on file. A Level 1 PPAP doesn't mean the layout was skipped. It means the customer didn't ask to see it.
An AS9102 FAIR has no levels. The variable is scope: a full FAI or a partial (delta) FAI. A partial FAI re-verifies only the characteristics a change could affect, and still goes out on Forms 1, 2 and 3 for that scope.
My shop does both automotive and aerospace work: what can I reuse?
A shop doing both can reuse the ballooned drawing, the measured values, the gauge records and the material and process certs. The forms, the PSW and the process documents (PFMEA, control plan, capability studies) have to be built for PPAP.
The table maps the 18 AIAG PPAP elements, in the manual's order, against an AS9102 FAIR. The right column is what a job shop can carry from one package to the other on the same or a similar part.
| # | PPAP element | Where it lives in an FAI | Reuse |
|---|---|---|---|
| 1 | Design records | The drawing referenced on Form 1, ballooned | Yes. One ballooned drawing serves both. |
| 2 | Authorized engineering change documents | Drawing revision and additional design changes on Form 1 | Yes, the same ECN or deviation reference. |
| 3 | Customer engineering approval | Not in the FAIR | No. |
| 4 | Design FMEA | Not in the FAIR | Rarely relevant to a build-to-print shop. |
| 5 | Process flow diagram | Not in the FAIR. Your router or traveler describes the same flow. | Your router or traveler is the starting point. |
| 6 | Process FMEA | Not in the FAIR | No, but Form 3 failures are good PFMEA input. |
| 7 | Control plan | Not in the FAIR | Partly. Gauges and methods chosen for the FAI often become the control plan's methods. |
| 8 | Measurement system analysis (MSA) studies | Not required by AS9102. Auditors check gauge calibration under AS9100. | Calibration records, yes. Gauge R&R, PPAP only. |
| 9 | Dimensional results | Form 3 | Yes, the biggest overlap. Same characteristics, same actual values, different form. |
| 10 | Records of material and performance test results | Form 2: materials, special processes, functional tests | Yes. The same mill certs and process certs. |
| 11 | Initial process studies | Not in the FAIR | No. |
| 12 | Qualified laboratory documentation | Indirectly, through approved special process sources on Form 2 | Partly. Lab scope and accreditation certificates. |
| 13 | Appearance approval report | Not in the FAIR | No. |
| 14 | Sample production parts | The FAI part itself, if the customer wants it shipped | Depends on the customer. |
| 15 | Master sample | Not in the FAIR | No. |
| 16 | Checking aids | Form 3, designed or qualified tooling column | Yes, the same fixture IDs. |
| 17 | Customer-specific requirements | Purchase order flow-downs and customer forms | No. Read each customer's manual. |
| 18 | Part Submission Warrant | Form 1 plays a similar cover-sheet role | No. Different form, different declaration. |
In practice, the reuse happens upstream of the forms. Do these five things once and both packages draw from them:
- Balloon once, with stable numbers. Keep one characteristic list per drawing revision. Don't renumber for the PPAP and again for the FAIR, because cross-referencing two numbering schemes is how characteristics get lost. Our guide to ballooning a drawing covers numbering order and notes.
- Record actual values, never "OK". An SQE reviewing a PPAP and one reviewing a FAIR will both push back on attribute results where a measurement was possible.
- Keep gauge IDs on every reading. AS9100 auditors trace a reading to a calibrated gauge. PPAP MSA studies need the same gauge IDs.
- File certs by heat lot and process lot. Form 2 and PPAP element 10 pull from the same folder.
- Then fill each customer's form. The final step is transcription, not re-inspection.
Don't swap forms without asking. An AS9102 Form 3 sent in place of PPAP dimensional results, or the reverse, can come back rejected for the format alone, even when every number is right. Ask the SQE first, and get the answer in writing.
Both packages start with the same ballooned drawing. Try the free ballooner on one of your own prints.
Try the free balloonerWhen does a PPAP or an FAI have to be redone?
Both are redone after design, tooling, material, source and location changes. The two differences that trip up shops doing both are the idle clock and who decides.
- The idle clock. AS9102 calls for a full or partial FAI after a two-year lapse in production, unless the customer specifies a different period. The AIAG PPAP equivalent is tooling inactive for volume production for 12 months or more, which requires customer notification and usually a resubmission. A part that's fine for an aerospace customer after 18 months idle may already need action for an automotive one.
- Who decides. AS9102 asks whether a change could affect fit, form or function, and lets the supplier answer with a partial FAI. The AIAG manual requires the supplier to notify the customer of the listed changes, and the customer then decides whether a submission is needed and at what level. Under PPAP, the decision is less often the supplier's alone.
The shared triggers are a new drawing revision, new or modified tooling, a new material or a new special process source, and moving the job to a different plant. The full vs partial FAI guide lists the AS9102 events with worked examples.
Does aerospace use PPAP?
Yes. AS9145, published by SAE for the IAQG, defines advanced product quality planning (APQP) and PPAP for aviation, space and defense, and some primes now flow it down on new programs.
AS9145 is not the AIAG manual with new labels. Its PPAP has 11 elements: design records, design risk analysis, process flow diagram, PFMEA, control plan, packaging, preservation and labeling approvals, MSA, initial process studies, the first article inspection report, customer PPAP requirements, and a PPAP approval form. Customers choose which elements apply to a contract; Boeing's quality clause Q017, for example, lets the buyer select the AS9145 artifacts required.
For an aerospace shop, "PPAP vs FAI" is turning into "PPAP including FAI". When an AS9145 flow-down lands on your desk, the FAIR process doesn't change, but the work around it grows: PFMEA, control plan and capability data for the characteristics the customer designates. Read the customer's PPAP clause before you build templates, since it decides which elements you owe.
PPAP vs FAI: frequently asked questions
Is FAI part of PPAP?
In automotive PPAP under the AIAG manual, the dimensional results element (element 9) covers the same ground as an FAI: every characteristic on the design record, measured and recorded. In aerospace PPAP under AS9145, the first article inspection report is itself one of the 11 PPAP elements. In both cases the full dimensional layout sits inside the larger PPAP package, alongside the process documents.
Can I submit an AS9102 FAIR instead of PPAP dimensional results?
Only if the customer agrees in writing. The measurements are often the same, but automotive customers usually expect results on their own format or the AIAG layout, from each cavity, die or production line, on parts from a significant production run. Ask the customer's supplier quality engineer before you send an AS9102 Form 3 in place of PPAP dimensional results.
What is a significant production run in PPAP?
A significant production run is the PPAP sample run. Under the AIAG PPAP manual it lasts one to eight hours of production and totals at least 300 consecutive parts, unless the customer's authorized representative specifies otherwise. The parts must come from production tooling, gauges, process, materials and operators. An AS9102 FAI, by contrast, needs one representative part from the first production run.
Does aerospace use PPAP?
Yes. AS9145 defines APQP and PPAP for aviation, space and defense, and some primes flow it down on new programs. AS9145 PPAP has 11 elements instead of the AIAG manual's 18, and one of them is the first article inspection report. The customer's purchase order or quality clause decides which AS9145 elements a supplier must deliver.
What is the difference between a PSW and AS9102 Form 1?
Both act as the cover sheet. The Part Submission Warrant (PSW) summarizes a whole PPAP package, states the reason for submission and carries the customer's disposition. AS9102 Form 1 identifies the part, drawing revision, full or partial FAI and the reason, indexes sub-assembly FAIs, and records whether the FAIR contains documented nonconformances. They aren't interchangeable.
Where software helps
The shared core of both packages is a ballooned drawing and a clean list of characteristics with actual values and gauge IDs. Toolrick does that part: it balloons the drawing, shows a confidence score on each balloon and flags the ones it's unsure of, takes pasted CMM text output into Form 3, and blocks sign-off on readings from an out-of-calibration gauge. It produces AS9102 forms following the Rev C layout and field numbering. It doesn't produce a PSW, a PFMEA or capability studies. A preparer and an approver still sign.
Related: AS9102 Form 3 explained · First article vs first piece inspection · Why FAI reports get rejected · Free AS9102 templates · Gage R&R study, worked example
Sources
- What is the Production Part Approval Process (PPAP)? Plexus International (the 18 elements, citing the AIAG PPAP manual).
- PPAP production part approval process guide, Fabrico (submission levels 1 to 5).
- PPAP explained, Fictiv (significant production run, 1 to 8 hours and 300 consecutive parts).
- What is PPAP?, 16949 Store (submission triggers and customer-notification events).
- AS9145 requirements for aerospace and defense, RGBSI (the 11 AS9145 PPAP elements).
- AS9145: Requirements for APQP and Production Part Approval, SAE International.
- Quality clause Q017 (AS9145 APQP/PPAP), Boeing Suppliers.
- AS9102 First Article Inspection Report Rev B vs Rev C, Net-Inspect.